Sunday, June 10, 2012

House update

In the last month and a half we have made a lot of progress on our house.  We have finished laying the block and put a solid concrete beam above the windows all around the house.



The next step was pouring the concrete roof.  First wood was placed to form the mold for the roof and then it was filled with rebar.  These pictures show the workers shoveling and spreading the concrete on top of that structure.



Now we have to wait about 2 weeks before we remove the wooden mold and the roof is done!  So exciting!  Next step: pour a concrete floor and put plaster on the walls.